New Jersey Osprey Project: Cold Weather Ices Over Installations


Photo credit: New Jersey Osprey Project



This winter has been cold. Bone-chilling cold. Arctic winds have blanketed our area for some time now. They have drastically reduced surface water temperatures to the point where small bays, creeks, and ditches are frozen over. These cold temperatures have also delayed any osprey platform work (repairs and installations) until March unless temperatures rise for an extended period of time.

     

    What did you think of this article?




    Trackbacks
    • No trackbacks exist for this post.
    Comments
    • No comments exist for this post.
    Leave a comment

    Submitted comments are subject to moderation before being displayed.

     Name

     Email (will not be published)

     Website

    Your comment is 0 characters limited to 3000 characters.